Questions and Answers : Windows : Granted credit 1/3 of expected
Author | Message |
---|---|
brusawyer Send message Joined: 16 Dec 05 Posts: 1 Credit: 534,567 RAC: 52 |
Seems to be a lot of CPU time for minimal granted credit. Checked history and it seems to be drastically less. Does the project just not need us so it's granting less? Some projects have no work and are cutting back, is this the case here? |
Mod.Sense Volunteer moderator Send message Joined: 22 Aug 06 Posts: 4018 Credit: 0 RAC: 0 |
There is always plenty of work. It appears there are some new tasks that the watchdog is finding running for longer than expected, and it's only granting 20 credits on those. So that's a specific issue that needs to be addressed with the WUs, not to be taken as any indication of relative value or timeliness of your efforts helping the project. Rosetta Moderator: Mod.Sense |
Questions and Answers :
Windows :
Granted credit 1/3 of expected
©2024 University of Washington
https://www.bakerlab.org